![](https://inivos.com/app/uploads/2022/09/MG_9753-web.jpg)
![Background_Icon Icon of a hospital](https://inivos.com/app/uploads/2020/06/Background_Icon.png)
Background
Salisbury NHS Foundation Trust Hospital recently underwent some renovation work on one of its wards. They required additional space at a neighbouring care facility to house patients whilst the renovation work was carried out. However, the ward had been empty for a period of time and required a deep clean and decontamination.
![Method_Icon Clinical cross surrounded by 2 circular arrows](https://inivos.com/app/uploads/2020/06/Method_Icon.png)
![Results_Icon Graph icon indication a reduction](https://inivos.com/app/uploads/2020/06/Results_Icon.png)
Result
87 processes occurred throughout this two-day period, ensuring that the Trust’s cleaning resource was supported thoroughly and the deadline was met. A safe patient space was created and the Trust were able to maintain patient flow whilst undergoing vital renovation works.